Maintenance Solutions
For Data Centers
Prevent Chances of Downtimes To Increase
Productivity and Profitability.
According to a research in 2011, every minute downtime in a data center will result in a loss of approximate $5,600 USD. The research also highlighted that more than 39 percent of the downtime was due to data center's power, which consists of UPS system failure (including batteries) and generator failure.
Therefore, regular predictive and preventive maintenance of data centers is crucial, so as to maximise the performance and reliability of mission-critical equipment, which can prevent chances of downtimes, and thus increase productivity and profitability. Hioki provides measurement solutions for the maintenance of Data Centers highly sensitive equipments. Here, we will introduce measuring instruments for each section:
1. Substations
2. Power Control Boards
3. Switchboards
4. UPS
5. In-house Generators
6. PV Systems
7. Grounding Rods
8. Air-conditioning
9. 5G Antennas
10. Data Servers

1. Power Receiving and Transforming Equipment
2. Power Control Boards
3. Switchboards
Verify Phase Rotation | Test Insulation | Test Supply Voltage | Verify Load Current | ||||
Detect Leakage Current | Detect Electrical Disturbances. Analyze Power Quality | Record and Analyze Electrical Consumption | Test 5kV Insulation | ||||
Equipment Damage and Malfunction Due To Power Quality
Implement Reliable Maintenance Programs With | |
For more information, please click here: | For more information, please click here: |
4. Uninterruptible Power Supply (UPS)
Test Battery Resistance & Voltage | |
Battery Tester BT3554-51 KIT
|
Reliable Preventive Maintenance of UPS
Diagnose Deterioration Of Lead-Acid Batteries | Measure Mixed AC and DC signals | |
Measure correctly even in noisy environments. | Reach deep with battery racks. | Thin jaw tackles complicated wire with ease. |
5. Power Generators
Verify Phase Rotation | Verify Motor Insulation | Test Supply Voltage | Test Load Current | ||||
6. PV Systems
Test Bypass Diodes | Verify Grounding | Test PV Insulation | Verify String Current | Verify String Current | ||||
7. Grounding Rods
Verify Grounding | |
8. Air Conditioning
9. 5G Antennas
Test Insulation | Test Supply Voltage | Test Load Current | |||
Check Voltage, Temperature and Humidity | Check Temperature and Humidity | Check Temperature | |||
10. Servers
Verify LAN Wiring | |